Agents running Checking screen…

Fuselage assembly · A320 family

Seven agents watching quality, scrap, section progress and right-first-time on Line 2.

CW 42–43 · 14–20 Oct 2026 Simulated sample data

About this dashboard

Hide

Goal: give the A320 fuselage line one place to see whether assembly is on track for quality, cost and delivery, and why it is not when it slips. The four KPIs that decide this are quality complaints, scrap, assembled regions against plan, and right first time. A team of AI agents watches them around the clock, spots deviations as they happen, finds likely causes and routes each issue to the right person, so the line reacts within minutes instead of at the next shift meeting.

Who it is for

Shift and line leads, quality engineers, production planners and the project team responsible for fuselage assembly.

What the agents do

  • Read SAP QM, SAP MM, MES confirmations, inspection records and torque logs
  • Classify each quality notification and assign an owner
  • Keep the scrap Pareto and section status current
  • Compute right first time per station and shift
  • Open an 8D when a limit is crossed and escalate to the shift lead
  • Draft the shift handover

How to read it

  • Top: the four KPIs against the previous 7 days and their targets
  • Middle: where the problems sit: defect mix, fuselage sections, scrap drivers, stations
  • Bottom: agent orchestration, showing how the agents share and hand over the work
  • Right: ask the line assistant for causes, held sections or a handover

What it should achieve

  • Faster reaction to quality and scrap events
  • Fewer repeat defects through early root-cause work
  • Less manual KPI collection and reporting
  • One shared picture of the line across shifts

Prototype with simulated sample data. No connection to production systems.

KPI trend

Daily, last 7 days, against target

Quality complaints by defect

Quality notifications raised, last 7 days

0QNs

    Assembled regions

    Section status per aircraft in the line. Select a section for detail.

    Assembled In work Held by open QN Planned

    Scrap Pareto

    Scrap value by part family, last 7 days

    €0

    Right first time by station

    First-pass inspection acceptance, target 95%

    Vertical mark = 95% target.

    Agent roster

    Orchestrator plus specialists, with the system each one reads

    0 busy

    Live agent activity

    Hand-offs and findings as they happen

    0 events

      Agent orchestration

      How the agents share the work this shift. Select an agent in the graph to focus every view on it.

      Orchestration graph

      Data sources → specialists → orchestrator. Line width = events this shift, moving dots = live hand-offs.

      Incident trace

      One case from detection to resolution

      Shift timeline

      Each bar is one agent task. Thin vertical lines are hand-offs between lanes. The shaded part is the rest of the shift.

      Where the work flows

      Events this shift, from data source to agent to outcome

      Agents on the fuselage

      Aircraft follows the selector in Assembled regions

        Agent × KPI

        Actions per agent and KPI this shift

        Load and response time

        Average agents busy per 15 minutes, stacked by agent, with events received below